Difficulty

Moderate

Steps

11

Time Required

                          5 - 10 minutes            

Sections

3

  • Bin
  • 4 steps
  • Main Body
  • 4 steps
  • Cyclone
  • 3 steps

Flags

0

  • BackDyson v6 Absolute

  • Full Screen

  • Options

  • History

  • Save to Favorites

  • Download PDF

  • Edit

  • Translate

  • Get Shareable Link

  • Embed This Guide

  • Notify Me of Changes

  • Stop Notifications

Introduction

What you need

Step 1

              Bin               
  • Unplug the device.

Unplug the device.

1024

Step 2

  • Push down the red lever located on the outside of the bin, next to the device handle, to open the door to the debris bin.
  • Avoid pressing the trigger on the handle opposite the red lever, which activates the motor.

Push down the red lever located on the outside of the bin, next to the device handle, to open the door to the debris bin.

Avoid pressing the trigger on the handle opposite the red lever, which activates the motor.

Step 3

  • Push the red lever down a second time to release the debris bin.
  • Avoid pressing the trigger on the handle opposite the red lever, which activates the motor.

Push the red lever down a second time to release the debris bin.

Step 4

  • Pull bin away from the cyclone.

Pull bin away from the cyclone.

Step 5

              Main Body               
  • Separate the bin from the main body of the device.

Separate the bin from the main body of the device.

Step 6

  • Locate two visible white clips between the main body and the cyclone.

Locate two visible white clips between the main body and the cyclone.

Step 7

  • Use tweezers to pinch the white clips together.
  • Widely hold the tweezers apart to get them to reach between the two white clips.
  • Because the space is tight between the cyclone and the main body, pinching the white clips may require additional effort.

Use tweezers to pinch the white clips together.

Widely hold the tweezers apart to get them to reach between the two white clips.

Because the space is tight between the cyclone and the main body, pinching the white clips may require additional effort.

Step 8

  • Tilt and pull the main body away from the cyclone.
  • There may be a loud snap when the main body separates from the cyclone.

Tilt and pull the main body away from the cyclone.

There may be a loud snap when the main body separates from the cyclone.

Step 9

              Cyclone               
  • Use the spudger to remove the cyclone.
  • Start at the small opening beneath the place where the cyclone connects to the main body.
  • Work the spudger around the rim of the red screen filter.
  • You will hear popping noises.

Use the spudger to remove the cyclone.

Start at the small opening beneath the place where the cyclone connects to the main body.

Work the spudger around the rim of the red screen filter.

You will hear popping noises.

Step 10

  • Use a T9 Torx screwdriver to remove five 14mm screws from the edge of the screen filter body.

Use a T9 Torx screwdriver to remove five 14mm screws from the edge of the screen filter body.

Step 11

  • Remove the filter screen cover away from the cyclone.
  • Pull down on the black tube inside the cyclone body to remove it from the cyclone.

Remove the filter screen cover away from the cyclone.

Pull down on the black tube inside the cyclone body to remove it from the cyclone.

To reassemble your device, follow these instructions in reverse order.

Cancel: I did not complete this guide.

                                                                                      13 other people completed this guide.                                             

Author

                                      with 2 other contributors 

                    Tabitha Espina Velasco                     

Member since: 01/23/2017

3,375 Reputation

                                      5 Guides authored                  



                       Badges:
                       16







                                                        +13 more badges                           

Team

                       Washington State, Team 1-2, Staggers Spring 2017                        

                                                  Member of Washington State, Team 1-2, Staggers Spring 2017 



                    WSU-STAGGERS-S17S1G2                     


                                            2 Members                     


                                            20 Guides authored